SoMo Pima Canyon Trail & Land Rehab



Upcoming Events
There are no upcoming events.

Completed Work
Number of Events: 24
Total Volunteer Hours: 947
Total Participants: 177
Project Outputs
Other (Repaired drainage): 1
Other (Volunteers trained on where and how to observe and track trail traffic.): 2
Other: 2
Other (50 feet of trail reclaimed): 50
Other (volunteers trained on where and how to observe and track trail traffic): 5
Feet of realigned trail built: 1505
Feet of new trail built: 290
Other (volunteer trained on where and how to observe and track trail traffic): 1
Feet of existing trail maintained: 7840
Other (drains opened/repaired/rehabilitated): 38
Other (Sign posts reinstalled): 3
Hardened drainage(s) built (Drains hardened to prevent headcutting): 8
Hardened drainage(s) built: 55
Feet of existing trail maintained (Tread widened and finished): 150
Other (interviews conducted with trail users in Pima Canyon): 55
Leaders trained: 1
Other (1 water collection structure built): 1
Feet of existing trail maintained (corridor clear only): 400
Feet of realigned trail built (new partial bench tread): 25
Other (Various tasks for trail improvement): 1
Feet of degraded trail rehabilitated: 100
Feet of trail closed for revegitation (300 feet of trail closure): 300
Zuni bowls built: 1
Other (drains reinforced with rock): 2
Feet of realigned trail built (Tread realigned after the relocation of 2 huge boulders): 40
Feet of trail closed for revegitation (reclaimed social trail into wash): 75
Other (Trail Head Drain Repair): 1
Other (drainage structures built): 6
Other (Drains cleared/reinstalled/reestablished): 20
Feet of rock wall built (reinforced existing retaining wall): 10
Feet of new trail built (100 feet or new trail built): 100
Feet of trail closed for revegitation: 325

Completed Event Reports

January 20, 2015  Pima/Beverly Canyon Trail Maintenance & Repair
7 VOAZ volunteers spent the morning at Beverly Canyon (South Mountain Park) working on basic trail maintenance. The group repaired and rebuilt drains, trimmed back plants in the corridor, reinforced a retaining wall and made general improvements on the trail. We were visited by Moose the horse (owned by one of the volunteers and led out by her husband). Dave received his coveted 10-PIN as recognition for his tenth VOAZ volunteer event.
Total Volunteer Hours: 34    Total Participants: 7
Event Outputs
Feet of rock wall built (reinforced existing retaining wall): 10
Feet of trail closed for revegitation: 50
Hardened drainage(s) built: 5
Other (drains opened/repaired/rehabilitated): 38

December 17, 2014  Pima/Beverly Canyon Trail Maintenance & Repair
Three VOAZ volunteers spent the morning performing trail maintenance on the loop near the golf course. The rain-dampened made the work go faster & easier. There were plenty of quail & rabbits in the area enjoying the weather.
Total Volunteer Hours: 13    Total Participants: 3
Event Outputs
Feet of existing trail maintained: 1000
Other (Drains cleared/reinstalled/reestablished): 20

November 18, 2014  Pima/Beverly Canyon Trail Maintenance & Repair
11/18/14 South Mountain Pima/Beverly Canyon Trail Repair

VOAZ volunteers spent their morning helping restore the Pima Wash Trail in South Mountain Park. The trail saw heavy damage due to flooding. The group build and/or opened 30+ drains, debermed hundreds of feet of tread, built a zuni bowl structure to protect the edge of the tread, unearthed two sign posts buried in the sand, found one post 30' downstream from the original site. The sign posts were reinstalled in their proper places helping hikers find their way along the trail.
Total Volunteer Hours: 36    Total Participants: 7
Event Outputs
Feet of existing trail maintained: 3000
Feet of realigned trail built (new partial bench tread): 25
Hardened drainage(s) built: 4
Other (Sign posts reinstalled): 3
Zuni bowls built: 1

January 15, 2014  Trailhead Drain Repair
No Report Information
Total Volunteer Hours: 15    Total Participants: 4
Event Outputs
Other (Trail Head Drain Repair): 1

December 17, 2013  Trailhead Drain Repair
No Report Information
Total Volunteer Hours: 18    Total Participants: 5
Event Outputs
Other (Repaired drainage): 1

February 23, 2013  Pima Canyon/Pima Wash
VOAZ volunteers took advantage in a break in the winter weather and spent time working on the eastern leg of the Pima Wash/Beverly Canyon perimeter trail. With three first-timers, the group was able to wrap up all of the tasks requested by the Phoenix Parks folks. Photos of this event and a previous weekday event (using an excavator to construct a large drainage crossing) can be seen at this link:https://picasaweb.google.com/voazalbums/February232013SOMOEvent
Total Volunteer Hours: 40    Total Participants: 6
Event Outputs
Feet of existing trail maintained: 1000
Hardened drainage(s) built: 8

January 24, 2013  Pima Canyon/Pima Wash
No Report Information
Total Volunteer Hours: 24    Total Participants: 4
Event Outputs
Feet of existing trail maintained (corridor clear only): 400
Hardened drainage(s) built: 2

January 19, 2013  Pima Canyon/Pima Wash
Photos for this event:
Pima Canyon / Pima Wash 1-19-2013
Total Volunteer Hours: 77    Total Participants: 11
Event Outputs
Feet of realigned trail built: 350

January 19, 2013  Trail Use Interviews
With a small crew throughout the day, we received a total of 55 interviews and gave away nearly all our goodies. We received 13 surveys from Pima East and the rest from the trailhead areas. It wa such a beautiful day, that even a baby rattlesnake came out to play.
Total Volunteer Hours: 22    Total Participants: 6
Event Outputs
Other (interviews conducted with trail users in Pima Canyon): 55

January 19, 2013  Trail Use Observation Orientation
No Report Information
Total Volunteer Hours: 1    Total Participants: 1
Event Outputs
Other (volunteer trained on where and how to observe and track trail traffic): 1

January 13, 2013  Trail Use Observation Orientation
No Report Information
Total Volunteer Hours: 5    Total Participants: 5
Event Outputs
Other (volunteers trained on where and how to observe and track trail traffic): 5

January 12, 2013  Pima Canyon/Pima Wash
Nine VOAZ volunteers braved the cold weather and worked diligently on the north side of the Pima Wash/Beverly Canyon perimeter loop. Sections of highly eroded tread were replaced with more sustainable, contouring tread, existing drains were cleared, new drains added where needed and multiple other tasks were completed to enhance the trail for all levels and types of users. The group included three First-Timers (Rob, George & Tom).; we certainly hope to see them at future events.
Total Volunteer Hours: 36    Total Participants: 9
Event Outputs
Feet of degraded trail rehabilitated: 100
Feet of realigned trail built: 150
Feet of trail closed for revegitation: 75
Hardened drainage(s) built: 8

January 5, 2013  Trail Use Observation Orientation
Volunteers donated their time to observe trail traffic in the Pima Canyon area of South Mountain Park. Volunteers were shown the designated viewing points and instructed on how to fill out the tracking worksheets. Observation work will be completed at volunteer's leisure through the month of January. A calendar will be kept off-line to document and coordinate days and hours observed. A new volunteer has already completed 5 hours of observation work since orientation. This study will help us understand the most and least used trail segments in order to plan for improvements in the area this fall.
Total Volunteer Hours: 2    Total Participants: 2
Event Outputs
Other (Volunteers trained on where and how to observe and track trail traffic.): 2

December 13, 2012  Pima Canyon/Pima Wash
Seven volunteers donated their time to continue work on the trails in South Mountain Park. Tasked completed included building hardened drains to protect the tread, reclaimation of a social trail that appeared within the last 60 days, realignment a highly eroded section of trail including the reloaction of two boulders). Jim G was awarded his 10-Pin for his participation.
Total Volunteer Hours: 30    Total Participants: 7
Event Outputs
Feet of realigned trail built (Tread realigned after the relocation of 2 huge boulders): 40
Feet of trail closed for revegitation (reclaimed social trail into wash): 75
Hardened drainage(s) built: 8

December 8, 2012  Pima Canyon/Beverly Canyon perimeter trail(s)
Thanks to the sixteen volunteers that completed the trail reroute on the northern perimeter of the Beverly Canyon area. We welcomed four first-timers and the return of an "early days" volunteer. In addition, we recognized Joe Z for his 90th VOAZ volunteer event.. This event is part of a large project at South Mountain Park in effort to restore & maintain sustainable trails in the Pima Canyon/Beverly Canyon section of the park.

Photos located: https://picasaweb.google.com/voazalbums/20121208SoMo
Total Volunteer Hours: 112    Total Participants: 16
Event Outputs
Feet of realigned trail built: 275
Hardened drainage(s) built: 3

February 25, 2012  NE South Mountain Park trail reroute
South Mountain Pima Canyon Trail 2012 02 25


Michael Baker and Kristi worked with a group of 8 youth volunteers to complete the 300 feet of trail closure. Mike Snodgrass worked with the 15 adult volunteers to construct 100 feet of new trail and add drainages to the existing trail. John (Kristi's husband) worked with the volunteers and built the water collection structure..
Total Volunteer Hours: 109    Total Participants: 23
Event Outputs
Feet of new trail built (100 feet or new trail built): 100
Feet of trail closed for revegitation (300 feet of trail closure): 300
Other (drainage structures built): 6
Other (drains reinforced with rock): 2
Other (50 feet of trail reclaimed): 50
Other (1 water collection structure built): 1

January 21, 2012  PimaCanyon Trail maintenance/rehab
VOAz South Mountain - Jan 21


Volunteers constructed 290 feet of new trail along Pima Canyon trail, skirting an eroded and steep stretch of the original trail. 200 feet of old trail was closed. The new trail was artfully connected to the main trail.
Total Volunteer Hours: 100    Total Participants: 14
Event Outputs
Feet of new trail built: 290
Feet of trail closed for revegitation: 200

January 10, 2012  Trail maintenance and rehab
Three VOAZ volunteers joined together to finish the trail maintenance tasks in Beverly Canyon. Tasks included tread widening on a rerouted section of trail, 8 drainage structures constructed to prevent headcutting and clearing existing drains.
Total Volunteer Hours: 21    Total Participants: 3
Event Outputs
Feet of existing trail maintained (Tread widened and finished): 150
Hardened drainage(s) built (Drains hardened to prevent headcutting): 8

January 7, 2012  Beverly Canyon Trail Reroute
Beverly Canyon 2012 01 07
Total of 14 volunteers working the trail 1 volunteer [Marylin] food service part of 12 hours pre and post time 3 non volunteer [contract] We did not have any no shows
Total Volunteer Hours: 110    Total Participants: 18
Event Outputs
Feet of existing trail maintained: 2840
Feet of realigned trail built: 320
Hardened drainage(s) built: 17

December 3, 2011  Beverly Canyon Trail reroute
Voaz - 12-03


Eleven volunteers constructed 410 feet reroute along the Beverly Canyon trail, skirting an eroded and steep stretch of the original trail. Included in the work were connections to the main trail, reclamation of unauthorized trails, and a strategically placed rock blocking hikers but allowing drainage between trails at a fork. Cyclists tested the new stretch of trail while we were on site and gave approval.
Total Volunteer Hours: 60    Total Participants: 11
Event Outputs
Feet of realigned trail built: 410

November 30, 2011  Trail realignment
Three volunteers added to the list of completed tasks: the work included finishing a reroute started the previous day, reclaiming a section of unsustainable trail, and installing eight drains.
Total Volunteer Hours: 16    Total Participants: 3
Event Outputs
Other: 1

November 29, 2011  Trail maintenance and rehab
Eight volunteers continued work on the perimeter trail throught Pima Wash. Included in the work were several constructed and cleared drains, reclaimation of unused/unauthorized trails, and the beginning of a reroute.
Total Volunteer Hours: 46    Total Participants: 8
Event Outputs
Other: 1

November 22, 2011  Trail Maintenance & Rehab
VOAZ volunteers and staff began the tasks involved in upgrading the trail system in the Pima Canyon section of South Mountain Park. The crew perfromed tasks that included pruning & trimming plants along the corridor, construction full bench tread, reclaiming old trails and tracks, and installing drainage structures.
Total Volunteer Hours: 19    Total Participants: 3
Event Outputs
Other (Various tasks for trail improvement): 1

November 15, 2011  Project Orientation
No Report Information
Total Volunteer Hours: 1    Total Participants: 1
Event Outputs
Leaders trained: 1



Home  |  Events Calendar  |  Donate  |  Privacy Policy  |  Contact Us

Volunteers for Outdoor Arizona - 1843 E Third Street, Suite 103, Tempe, AZ 85281 - email: voaz@voaz.org
Site designed and developed by Michael Baker & JWS Web Design LLC